# Phase 1 — Next Steps (Small, Mergeable PRs) 1. **MUI v4 → v5 import fix** - Run: `bash scripts/dev/phase1/fix-mui-imports.sh --dry` then `--apply`. - Commit only the touched files + `reports/phase1-*/notes.txt` (optional). 2. **Remove TS suppressions** - Run: `bash scripts/dev/phase1/fail-on-suppressions.sh` (or `--allow=1` while fixing one file per PR). - Convert ignored sections to proper types or refactor. 3. **A11y: `` alt text** - Run: `bash scripts/dev/phase1/list-imgs-missing-alt.sh` and fix each instance (`alt` or `alt=""` if decorative). Keep each PR focused (1–5 files), branch from `update`, and let CI run.