Files
q-blog/docs/ROADMAP_DEPENDENCIES.md
greenflame089 0b100af686 Release v0.2.2
2025-08-22 07:28:42 -04:00

1.3 KiB
Raw Permalink Blame History

Q-Blog — Roadmap Dependencies & Milestones

Generated 2025-08-16 23:27Z

Dependency Graph (high level)

  • Phase 2 depends on Phase 1 docs (testing/a11y standards referenced).
  • Phase 3 depends on Phase 2 harness (to verify fixes).
  • Phase 4 (a11y) builds on Phase 3 stability.
  • Phase 6 (multi-blog) depends on Phase 5 UX patterns (switcher placement, routing clarity).
  • Phase 7 (shared blogs) depends on Phase 6 data model and routing.
  • Phase 10 (release) depends on all prior phases plus observability wiring.

Milestone Gates

  • M1 — Baseline Ready (P0P2): Docs present; typecheck/lint/tests green; coverage report generated.
  • M2 — Stable & Accessible (P3P4): No crashers; keyboard-only journeys pass; axe critical=0.
  • M3 — UX Solid (P5): Consistent patterns, no dead ends; editor ergonomics audited.
  • M4 — Multi-Blog (P6): Create/switch blogs with migrated legacy content.
  • M5 — Shared Blogs (P7): Role matrix enforced; invites work.
  • M6 — Resilient & Performant (P8P9): Vitals within budget; themes/i18n consistent.
  • M7 — Release Ready (P10): Telemetry, security checks, notes/guides done.

Audit Notes (v0.0.1)

  • ⚠️ Note: Release automation script had issues with curl args; roadmap should note fixing release tooling.